An alternative to LEI is decided by the bay it stands in, not by the datasheet. Five site conditions settle whether the swap runs on the first shift or waits a fortnight for an electrician: power, air, extraction, floor and the temperature swing across a year.
Why the Bay Decides an Alternative to LEI
Two continuous machines can print the same block and still not be interchangeable, because they ask different things of the building. A cabinet needing a clean earth is a different purchase from one that tolerates a shared neutral.
So the order of work is the reverse of the brochure. Photograph the bay, list what the old machine connects to, and let that list filter the shortlist before anyone argues about resolution.
Five Site Conditions to Measure First
| Condition | What to record | What it changes |
|---|---|---|
| Power | Voltage, phases, earth type | Whether the cabinet ships with a plug or a spur |
| Compressed air | Pressure, dew point, whether it is oil-free | Whether a filter unit is added to the quote |
| Extraction | Distance to a duct or an outside wall | Solvent build-up around the head |
| Floor and fixing | Level, anchoring, walkway width | Whether a stand or a bracket is needed |
| Temperature | Winter low and summer high in the bay | The viscosity band the grade is proved in |
The second row hides a cost. A plant without oil-free air adds a filter and dryer to the project, and one assuming its ring main is dry finds water in the head in the first humid week.
The fifth row is not a comfort question. Viscosity tracks temperature, so a bay swinging fifteen degrees needs a band covering both ends, and a grade proved at twenty degrees is only proved there.
Power, Air and the Duct Nobody Budgeted For
A continuous unit carries a pump and a heater, so the load is modest but supply quality matters more than wattage. A shared neutral beside a welding bay and a cabinet wanting a clean earth produce intermittent faults nobody can reproduce.
Extraction is the cheapest item. Solvent vapour is a health question first and an optics question second, and a duct planned after the machine lands costs more than the bracket.
The mechanism sits under continuous inkjet, and a build for export should follow the ISO 9001 quality management route. Neither says what your bay does in January.
Floor, Heat and the Dust a Packing Hall Makes
A coder is light until it sits on a stand. The fixing decides whether the head stays aimed, and a stand bolted to a slab vibrating with a case packer moves a millimetre a month.
Dust is the other half. Board sheds fibre all shift, it reaches the optics, and a hazed lens loses power quietly for weeks.
How We Survey a Bay Before Quoting
We ask for four photographs and one number: head position, power outlet, nearest duct, floor under the conveyor, and belt speed at the marking point. That tells us whether a stand is needed and whether the duct run is realistic.
What recurs in our export orders is the duct. Buyers photograph the machine and forget the wall behind it, so extraction is quoted short and installed long, and the difference lands on the installer.
The Unit We Ship for a Tight Bay
S1000 small character inkjet printer
the build for a hall where the power is shared and the floor is not level:
- Prints up to 400 Meters Per Minute
- 2-20mm print height
- 10.1-Inch Industrial Touchscreen
- 3-30mm throw distance
- Low 120W rated power
The 120W rating matters in a shared bay. A cabinet drawing little can share a circuit with a labelling head without an electrician, and the throw keeps it clear of a guard.
Send Photographs of the Bay, Not the Catalogue
- Do we need compressed air
- Not always, and the answer depends on the head rather than the brand, so ask in writing.
- Can the old bracket stay
- Sometimes, though the mounting height usually has to be re-measured.
- What if the bay is unheated
- The viscosity band widens, and the grade has to be proved at the winter low.
Send the four photographs and the belt speed, plus the winter low in the bay. We will return the power requirement, the extraction run and the grade band in writing, so the alternative to LEI you order is one your building can actually accept.